• Title of article

    A study of preproject planning and project success using ANNs and regression models

  • Author/Authors

    Wang، نويسنده , , Yu-Ren and Gibson Jr.، نويسنده , , G. Edward، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2010
  • Pages
    6
  • From page
    341
  • To page
    346
  • Abstract
    It has long been recognized by the industry practitioners that how well preproject planning is conducted has a great impact on project outcome. Through industry project data collection and model analysis, this research intends to investigate the relationship between preproject planning and project success. Preproject planning and project performance information from 62 industrial projects and 78 building projects, representing approximately $5 billion U.S.D. in total construction cost, is collected and used for this research analysis. Based on the information obtained, preproject planning is identified as having direct impact on the project success (cost and schedule performance). Two techniques were then used to develop models for predicting cost and schedule performance: statistical regression analysis, and artificial neural networks (ANNs). The research results provide a valuable source of information that supports better planning in the early stage of the project life cycle and have positive impact on the final project outcome.
  • Keywords
    Preproject planning , Project success , Regression model , ANN model
  • Journal title
    Automation in Construction
  • Serial Year
    2010
  • Journal title
    Automation in Construction
  • Record number

    1338175