Title of article :
Estimation of earthworks execution time cost by means of artificial neural networks
Author/Authors :
Hola، نويسنده , , Bozena and Schabowicz، نويسنده , , Krzysztof، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2010
Pages :
10
From page :
570
To page :
579
Abstract :
The paper presents a methodology for determining earthworks execution time and cost. The accurate determination of the productivity of machines working in sets is a major problem in earthworks execution planning. Earthworks are conducted in random condition and so the parameter values achieved during their realization have a random character. Using an existing database based on measurements carried out on a construction site, an artificial neural network was built. The latter was used to predict productivity for selected sets of machines and to calculate the task execution time and cost. The obtained set of results allows one to select the machinery set optimum with regard to earthworks execution cost or time.
Keywords :
construction , Artificial neural networks , earthworks , Sets of machines , Productivity
Journal title :
Automation in Construction
Serial Year :
2010
Journal title :
Automation in Construction
Record number :
1338207
Link To Document :
بازگشت