Title of article
BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies
Author/Authors
Zhang، نويسنده , , J.P. and Hu، نويسنده , , Z.Z.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2011
Pages
12
From page
155
To page
166
Abstract
Strengthening construction safety analysis and management is of great social and economic significance. For a long time, however, there has been a lack of effective management tools in this important area that involves peopleʹs lives and property. Based on new developments in the Building Information Model (BIM), four-dimensional (4D) technology, time-dependent structural analysis, collision detection, and so on, a 4D structural information model is presented and established according to the overall solution of analysis and management for conflict and safety problems during construction. Based on this sub-BIM, the integration of dynamic safety analysis of time-dependent structures, conflict analysis and management of schedule/resource/cost, and dynamic collision detection of site facilities is studied, and theories and key technologies are discussed in detail. The results of this research provide a feasible theory and methodology for integrated applications of BIM. Furthermore, this study proposes a new approach for conflict and safety analysis during construction through the integration of construction simulation, 4D construction management, and safety analysis. The approach lays a foundation for the popularization of complicated theories and methodologies, and has theoretical significance and application prospects in meeting the needs of improving the safety level during construction.
Keywords
Conflict analysis , Structural safety analysis , Building Information Model (BIM) , Integrated solution , construction management
Journal title
Automation in Construction
Serial Year
2011
Journal title
Automation in Construction
Record number
1338282
Link To Document