Title of article :
BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies
Author/Authors :
Zhang، نويسنده , , J.P. and Hu، نويسنده , , Z.Z.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2011
Abstract :
Strengthening construction safety analysis and management is of great social and economic significance. For a long time, however, there has been a lack of effective management tools in this important area that involves peopleʹs lives and property. Based on new developments in the Building Information Model (BIM), four-dimensional (4D) technology, time-dependent structural analysis, collision detection, and so on, a 4D structural information model is presented and established according to the overall solution of analysis and management for conflict and safety problems during construction. Based on this sub-BIM, the integration of dynamic safety analysis of time-dependent structures, conflict analysis and management of schedule/resource/cost, and dynamic collision detection of site facilities is studied, and theories and key technologies are discussed in detail. The results of this research provide a feasible theory and methodology for integrated applications of BIM. Furthermore, this study proposes a new approach for conflict and safety analysis during construction through the integration of construction simulation, 4D construction management, and safety analysis. The approach lays a foundation for the popularization of complicated theories and methodologies, and has theoretical significance and application prospects in meeting the needs of improving the safety level during construction.
Keywords :
Conflict analysis , Structural safety analysis , Building Information Model (BIM) , Integrated solution , construction management
Journal title :
Automation in Construction
Journal title :
Automation in Construction