• Title of article

    BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials

  • Author/Authors

    Hu، نويسنده , , Zhenzhong and Zhang، نويسنده , , Jianping، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2011
  • Pages
    14
  • From page
    167
  • To page
    180
  • Abstract
    In order to achieve the information-based integrated construction management, e.g., time-dependent structures analysis, schedule/resource/cost conflict analysis as well as dynamic collision detection amongst site facilities and main structure elements, an integrated archetypal system named 4D-GCPSU 2009 is developed. Through 3 project examples, it is verified that the integrated solution is able to assist construction managers or owners in the aspects of analysis and management for process conflict and structural safety problems during construction. The application outcome of the system is accepted and praised by users as they considered that the system functions and analysis results provide significant reference support to the approval and revision of construction proposals, increase efficiency and safety concerning building construction. They also point out some difficulties in practice. As for those difficulties mentioned, a series of solutions plus further development orientation are put forth.
  • Keywords
    construction management , system development , Site trial , Conflict analysis , Structural safety analysis
  • Journal title
    Automation in Construction
  • Serial Year
    2011
  • Journal title
    Automation in Construction
  • Record number

    1338283