Title of article :
Optimal earth pressure balance control for shield tunneling based on LS-SVM and PSO
Author/Authors :
Liu، نويسنده , , Xuanyu and Shao، نويسنده , , Cheng-Ming Ma، نويسنده , , Haifeng and Liu، نويسنده , , Renxi، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2011
Pages :
7
From page :
321
To page :
327
Abstract :
To avoid ground deformation in the process of earth pressure balance (EPB) shield tunneling, it is necessary to keep the earth pressure balance on excavation face. However, at present the earth pressure control depends mainly on operation experiences which is hysteretic and could result in slow response to the change of earth pressure. To solve these problem, a predictive control strategy for earth pressure balance during excavation is proposed in this paper, where an earth pressure prediction model taking advance speed and screw conveyor speed as the control parameters is established by means of least squares support vector machine (LS-SVM). Further, by minimizing the difference between the predicted earth pressure and the desired one, an optimization model of the control parameters is established, and solved by the particle swarm optimization (PSO) algorithm. Therefore, an optimal EPB control scheme for shield tunneling automatically is presented here. The simulation results demonstrate that the method presented in this paper is very effective to control earth pressure balance.
Keywords :
Shield machine , Earth pressure balance , Control , LS-SVM , PSO
Journal title :
Automation in Construction
Serial Year :
2011
Journal title :
Automation in Construction
Record number :
1338301
Link To Document :
بازگشت