• Title of article

    Analysis of modeling effort and impact of different levels of detail in building information models

  • Author/Authors

    Leite، نويسنده , , Fernanda and Akcamete، نويسنده , , Asli and Akinci، نويسنده , , Burcu and Atasoy، نويسنده , , Guzide and Kiziltas، نويسنده , , Semiha، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2011
  • Pages
    9
  • From page
    601
  • To page
    609
  • Abstract
    The main objectives of this paper are to evaluate the modeling effort associated with generating building information modeling (BIM) at different levels of detail (LoD) and the impact of LoD in a project in supporting mechanical, electrical and plumbing (MEP) design coordination. Results show an increase in total modeling time ranging from doubling the modeling effort to eleven folding it, when going from one LoD to another. When comparing modeling time per object, rates ranged from 0.2 (decreased modeling time) to 1.56 (increased modeling time). Based on the experiments done in MEP design coordination, it was observed that the automatic clash detection process using BIMs, with its consistently higher recall rate, provides a more complete identification of clashes, with the cost of false positives (low precision). This study showed that additional modeling effort can lead to more comprehensive analyses and better decision support during design and construction.
  • Keywords
    Level of detail impact , Modeling effort , building information modeling
  • Journal title
    Automation in Construction
  • Serial Year
    2011
  • Journal title
    Automation in Construction
  • Record number

    1338328