Title of article :
Modularization and assembly algorithm for efficient MEP construction
Author/Authors :
Tserng، نويسنده , , H. Ping and Yin، نويسنده , , Y.L. and Jaselskis، نويسنده , , Edward J. and Hung، نويسنده , , Wu-Chueh and Lin، نويسنده , , Yi-Chieh، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2011
Pages :
27
From page :
837
To page :
863
Abstract :
This paper presents an algorithm for efficiently designing, fabricating, and constructing the mechanical, electrical, and plumbing (MEP) systems for buildings. MEP facility construction presents numerous challenges related to its complexity, space limitations, and interference with other trades working in confined areas. Besides, schedule delays can easily be caused by the uncontrolled delivery schedule of the components. This research provides a rational planning algorithm which packages large and complex MEP systems into several smaller fabricated components using spatial planning algorithms to increase the efficiency of the installation process, create a safer work environment, improve construction quality and productivity, reduce construction cycle time, and minimize cost. Furthermore, the technique is verified and validated by three experts and a case study is presented to demonstrate the effectiveness of this algorithm.
Keywords :
prefabrication , Schedule delay , Space conflict , MEP system
Journal title :
Automation in Construction
Serial Year :
2011
Journal title :
Automation in Construction
Record number :
1338354
Link To Document :
بازگشت