Title of article
Multi-treatment capacitated arc routing of construction machinery in Taiwanʹs smooth road project
Author/Authors
Huang، نويسنده , , Shan-Huen and Lin، نويسنده , , Pei-Chun، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2012
Pages
9
From page
210
To page
218
Abstract
This study investigates the routing problems of road resurfacing in Taiwanʹs smooth road project, incorporating multiple treatments served by different construction machinery in a way that propagates extra time window constraints to ensure that a subsequent treatment starts after the required preceding treatment has started or been completed. The routing problem is modeled as a multi-treatment capacitated arc routing problem with time windows (MTCARPTW) in order to determine a set of trips at a minimum total cost that covers all required links of road resurfacing work. The MTCARPTW is first transformed into a traveling salesman problem (TSP); then, a heuristics method based on ant colony optimization (ACO) is applied and evaluated based on the set of given circumstances. The computational results indicate that the proposed algorithm is efficient. This research contributes to identifying a new routing problem, modeling this MTCARPTW, and introducing the ACO to solve the problem efficiently.
Keywords
Smooth road project , Arc routing problems , Ant colony optimization algorithm
Journal title
Automation in Construction
Serial Year
2012
Journal title
Automation in Construction
Record number
1338414
Link To Document