• Title of article

    Multi-treatment capacitated arc routing of construction machinery in Taiwanʹs smooth road project

  • Author/Authors

    Huang، نويسنده , , Shan-Huen and Lin، نويسنده , , Pei-Chun، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2012
  • Pages
    9
  • From page
    210
  • To page
    218
  • Abstract
    This study investigates the routing problems of road resurfacing in Taiwanʹs smooth road project, incorporating multiple treatments served by different construction machinery in a way that propagates extra time window constraints to ensure that a subsequent treatment starts after the required preceding treatment has started or been completed. The routing problem is modeled as a multi-treatment capacitated arc routing problem with time windows (MTCARPTW) in order to determine a set of trips at a minimum total cost that covers all required links of road resurfacing work. The MTCARPTW is first transformed into a traveling salesman problem (TSP); then, a heuristics method based on ant colony optimization (ACO) is applied and evaluated based on the set of given circumstances. The computational results indicate that the proposed algorithm is efficient. This research contributes to identifying a new routing problem, modeling this MTCARPTW, and introducing the ACO to solve the problem efficiently.
  • Keywords
    Smooth road project , Arc routing problems , Ant colony optimization algorithm
  • Journal title
    Automation in Construction
  • Serial Year
    2012
  • Journal title
    Automation in Construction
  • Record number

    1338414