Title of article
Fuzzy model for predicting project performance based on procurement experiences
Author/Authors
Chao، نويسنده , , Li-Chung and Hsiao، نويسنده , , Chih-Sheng، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2012
Pages
11
From page
71
To page
81
Abstract
This paper presents a data-clustering-based fuzzy model for predicting the performance of construction projects delivered through different procurement methods. To illustrate the model, a sample of 96 substation projects of an electric power company, delivered through the design–bid–build (DBB), design–build (DB), and turnkey (TK) methods, were used as training and testing data for model development and verification. Through a factor analysis, an initial set of 48 variables was reduced to nine inputs to the model for predicting eight performance metrics as outputs of the model. To establish the input–output relationships for each metric, Sugeno-type fuzzy inference systems were built, wherein the fuzzy rules were derived from selected projects as the estimated cluster centers in the training data. For the limited sample, zeroth-order systems built with hybrid training were found to outperform both first-order systems and stepwise regression models in prediction accuracy, while sensitivity analyses confirmed their robustness. As the data represents the companyʹs procurement experiences of substation projects, the model may be regarded as a way of implementing organizational learning to improve procurement decision.
Keywords
Construction project , Procurement method , Performance , Fuzzy Inference System , model
Journal title
Automation in Construction
Serial Year
2012
Journal title
Automation in Construction
Record number
1338554
Link To Document