Title of article :
Using a fuzzy clustering chaotic-based differential evolution with serial method to solve resource-constrained project scheduling problems
Author/Authors :
Cheng، نويسنده , , Min-Yuan and Tran، نويسنده , , Duc-Hoc and Wu، نويسنده , , Yu-Wei، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2014
Pages :
10
From page :
88
To page :
97
Abstract :
The resource-constrained problem seeks to find the optimal sequence that minimizes project duration under current precedence constraints and resource limitations. This study integrates the fuzzy c-means clustering technique and the chaotic technique into the Differential Evolution (DE) algorithm to develop the Fuzzy Clustering Chaotic-based Differential Evolution (FCDE) algorithm, an innovative approach to solving complex optimization problems. Within the FCDE, the chaotic technique prevents the optimization algorithm from premature convergence and the fuzzy c-means clustering technique acts as several multi-parent crossover operators in order to utilize population information efficiently and enhance convergence efficiency. Further, this study applies a serial method to reflect individual-user priorities into the active schedule and the project duration calculations. The FCDE and serial method are then integrated into a novel optimization model called the Fuzzy Clustering Chaotic-based Differential Evolution for Solving Resource Constrained Project Scheduling Problem (FCDE-RCPSP). Experiments run indicate that the proposed FCDE-RCPSP obtains optimal results more reliably and efficiently than the benchmark algorithms considered. The FCDE-RCPSP is a promising alternative approach to handling resource-constrained project scheduling problems.
Keywords :
Chaotic , construction management , differential evolution , Resource-constrained , Fuzzy clustering
Journal title :
Automation in Construction
Serial Year :
2014
Journal title :
Automation in Construction
Record number :
1338744
Link To Document :
بازگشت