• Title of article

    Solving Multi mode Resource Constrained Project Scheduling with ICO algorithm and Compare it with PSO algorithm

  • Author/Authors

    Namazi، Sina نويسنده Department of Industrial Engineering, Islamic Azad University, Karaj Branch , , Zare Fard، Mohammad Reza نويسنده Department of Industrial Engineering, Islamic Azad University, Qazvin Branch ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2014
  • Pages
    6
  • From page
    23
  • To page
    28
  • Abstract
    Well-timed execution of project activities requires an integrated and effective planning and management in an accurate adjustment of the project activities execution time. Although a lot of works has been done on MRCPSP (multi-resource constrained project scheduling problem) with the goal of minimizing the project makespan, but considering other goals in current projects like the project total cost is also important to the managers. So in this article, a mathematical model has been considered for resource-constrained project scheduling with two objectives: minimizing both project total cost and makespan. And this problem has been solved with a meta-heuristic algorithm called Imperialist Competitive algorithm which has never been used to solve this type of problems. The results have been compared with PSO algorithm in which they are satisfactory.
  • Journal title
    International Journal of Management Sciences and Economic(IJMECO)
  • Serial Year
    2014
  • Journal title
    International Journal of Management Sciences and Economic(IJMECO)
  • Record number

    1348113