• Title of article

    Path planning in construction sites: performance evaluation of the Dijkstra, A∗, and GA search algorithms

  • Author/Authors

    Soltani، نويسنده , , A.R. and Tawfik، نويسنده , , H. and Goulermas، نويسنده , , J.Y. and Fernando، نويسنده , , T.، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2002
  • Pages
    13
  • From page
    291
  • To page
    303
  • Abstract
    This paper presents the application of path planning in construction sites according to multiple objectives. It quantitatively evaluates the performance of three optimisation algorithms namely: Dijkstra, A∗, and Genetic algorithms that are used to find multi-criteria paths in construction sites based on transportation and safety-related cost. During a construction project, site planners need to select paths for site operatives and vehicles, which are characterised by short distance, low risks and high visibility. These path evaluation criteria are combined using a multi-objective approach. The criteria can be optimised to present site planners with the shortest path, the safest path, the most visible path or a path that reflects a combination of short distance, low risk and high visibility. The accuracy of the path solutions and the time complexities of the optimisation algorithms are compared and critically analysed.
  • Keywords
    Construction site , path finding , Optimisation algorithms , Multi-criteria
  • Journal title
    ADVANCED ENGINEERING INFORMATICS
  • Serial Year
    2002
  • Journal title
    ADVANCED ENGINEERING INFORMATICS
  • Record number

    1384169