Title of article
Incremental development of CBR strategies for computing project cost probabilities
Author/Authors
Raphael، نويسنده , , B. and Domer، نويسنده , , B. and Saitta، نويسنده , , S. and Smith، نويسنده , , I.F.C.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2007
Pages
11
From page
311
To page
321
Abstract
This paper presents three CBR systems that have been developed over seven years in collaboration with two industrial partners. In this research, case based reasoning (CBR) is used to compute costs of construction projects. In contrast with previous work in the field of CBR, the focus is on choosing strategies that are compatible with user needs and characteristics. Comparing the three strategies reveals advantages and drawbacks while illustrating a “real-life” evolution of a CBR architecture in an industrial context. An important conclusion is that the ways users perform tasks have a direct influence on the best architecture for the CBR system (e.g. transformational/derivational analogy). Incremental development of strategies in the final system improves user interaction, expedites time consuming tasks and favours identification of synergy between techniques such as CBR and data mining.
Keywords
Case based reasoning , Derivational analogy , Transformational analogy , Cost Estimation , Probability distribution , DATA MINING
Journal title
ADVANCED ENGINEERING INFORMATICS
Serial Year
2007
Journal title
ADVANCED ENGINEERING INFORMATICS
Record number
1384331
Link To Document