• Title of article

    Building-integrated PV modules

  • Author/Authors

    Benemann، نويسنده , , Joachim and Chehab، نويسنده , , Oussama and Schaar-Gabriel، نويسنده , , Eric، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2001
  • Pages
    10
  • From page
    345
  • To page
    354
  • Abstract
    The first installation of building-integrated photovoltaics (BIPV) was realized in 1991 in Aachen, Germany (Benemann et al., Adv. Sol. Energy 13 (1999) 317). The photovoltaic elements were integrated into a curtain wall façade with isolating glass. Today, photovoltaic modules for building integration are produced as a standard building product, fitting into standard façade and roof structures these elements created a whole new market: BIPV. Since then building integration is one of the fastest growing market segments in photovoltaics. An impressive solar installation, the Academy Mont-Cenis in Herne (Germany) with more than 10 000 m2 of photovoltaics integrated into the roof and façade was finished in March this year. Several other large-scale projects are under construction or in the planning phase.
  • Keywords
    Electrical connection system. , Building-integrated photovoltaics (BIPV) , Photovoltaic module design , Architectural applications of photovoltaics
  • Journal title
    Solar Energy Materials and Solar Cells
  • Serial Year
    2001
  • Journal title
    Solar Energy Materials and Solar Cells
  • Record number

    1477335