Factors influencing the success of BOT power plant projects in China: A review
Author/Authors :
Zhao، نويسنده , , Zhen-Yu and Zuo، نويسنده , , Jian and Zillante، نويسنده , , George، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2013
Pages :
8
From page :
446
To page :
453
Abstract :
The rapid economic growth in China has created massive demand for power generation facilities. Build–operate–transfer (BOT) concessions have been granted to attract foreign and private investment. Interest in the BOT scheme for power plant projects has been growing rapidly. BOT projects normally involve a number of parties and usually face a number of constraints. The identification of key factors for Chinese BOT projects helps to accomodate these constraints so that the expected project outcomes can be achieved. A multi-facet qualitative approach is adopted in this research to investigate the factors influencing the success of BOT electric power projects in China. The results showed that there are 14 factors at both macro level and micro level, affecting the success of Chinese BOT projects. The results indicate that the success of Chinaʹs BOT electric power projects require a combined efforts from all related stakeholders. These findings provide a valuable reference for both policy makers and investors for the future BOT power plant developments in China.
Keywords :
Build–operate–transfer (BOT) , Power plants , Success factors , CHINA
Journal title :
Renewable and Sustainable Energy Reviews
Serial Year :
2013
Journal title :
Renewable and Sustainable Energy Reviews
Record number :
1502724
Link To Document :
بازگشت