• Title of article

    Optimal management of the machine repair problem with working vacation: Newton’s method

  • Author/Authors

    Wang، نويسنده , , Kuo-Hsiung and Chen، نويسنده , , Wei-Lun and Yang، نويسنده , , Dong-Yuh Yang، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2009
  • Pages
    10
  • From page
    449
  • To page
    458
  • Abstract
    This paper studies the M/M/1 machine repair problem with working vacation in which the server works with different repair rates rather than completely terminating the repair during a vacation period. We assume that the server begins the working vacation when the system is empty. The failure times, repair times, and vacation times are all assumed to be exponentially distributed. We use the MAPLE software to compute steady-state probabilities and several system performance measures. A cost model is derived to determine the optimal values of the number of operating machines and two different repair rates simultaneously, and maintain the system availability at a certain level. We use the direct search method and Newton’s method for unconstrained optimization to repeatedly find the global minimum value until the system availability constraint is satisfied. Some numerical examples are provided to illustrate Newton’s method.
  • Keywords
    Cost , optimization , Working vacation , Newton’s method
  • Journal title
    Journal of Computational and Applied Mathematics
  • Serial Year
    2009
  • Journal title
    Journal of Computational and Applied Mathematics
  • Record number

    1555341