Title of article
Historical background on performance assessment for the Waste Isolation Pilot Plant
Author/Authors
Rechard، نويسنده , , R.P.، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2000
Pages
42
From page
5
To page
46
Abstract
In 1979, six years after selecting the Delaware Basin as a potential disposal area, Congress authorized the US Department of Energy to build the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, as a research and development facility for the safe management, storage, and disposal of waste contaminated with transuranic radioisotopes. In 1998, 19 years after authorization and 25 years after site selection, the US Environmental Protection Agency (EPA) certified that the WIPP disposal system complied with its regulations. The EPAʹs decision was primarily based on the results from a performance assessment conducted in 1996, which is summarized in this special issue of Reliability Engineering and System Safety. This performance assessment was the culmination of four preliminary performance assessments conducted between 1989 and 1992. This paper provides a historical setting and context for how the performance of the deep geologic repository at the WIPP was analyzed. Also included is background on political forces acting on the project.
Keywords
Waste Isolation Pilot Plant , Performance Assessment , probabilistic risk assessment , risk assessment , Radioactive waste disposal , HISTORY
Journal title
Reliability Engineering and System Safety
Serial Year
2000
Journal title
Reliability Engineering and System Safety
Record number
1568779
Link To Document