Title of article
Environmentally sensitive plot-scale timber harvesting: impacts on suspended sediment, bedload and bank erosion dynamics
Author/Authors
Stott، نويسنده , , Tim and Leeks، نويسنده , , Graham and Marks، نويسنده , , Steve and Sawyer، نويسنده , , Adam، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2001
Pages
23
From page
3
To page
25
Abstract
The impact on sediment pollution of environmentally sensitive harvesting of a 15 ha plot (20% of the catchment area) of mature coniferous plantation forest in the 0·89 km2Afon Tanllwyth catchment, Plynlimon, was investigated for 12 months before harvesting began and a further 18 months after. The results revealed: (a) a steepening of the suspended sediment concentration vs. discharge rating curve resulting in a 39% increase in suspended sediment yield (as compared to the adjacent forested Hafren catchment) during the year in which the harvesting operations took place; (b) a statistically significant increase in main channel bank erosion rates, as compared with the nearby Afon Cyff; main channel banks are estimated to have contributed around 80% of the total catchment suspended sediment yield during the two year period (1995–1996), and (c) no significant change in bedload yields over the duration of the study, though a longer post-harvesting time series of bedload data will be required to properly assess the impact of the harvesting operation upon bedload yields. Forest management implications of these findings are discussed in detail with respect to the existing Forest and Water guidelines.
Keywords
suspended sediment , Bank erosion , Bedload transport , Forest management , mid-Wales. , Timber harvesting
Journal title
Journal of Environmental Management
Serial Year
2001
Journal title
Journal of Environmental Management
Record number
1569104
Link To Document