Title of article :
Importance measures in ranking piping components for risk informed in-service inspection
Author/Authors :
Vinod، نويسنده , , Gopika and Kushwaha، نويسنده , , H.S. and Verma، نويسنده , , A.K. and Srividya، نويسنده , , A.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2003
Pages :
7
From page :
107
To page :
113
Abstract :
Risk informed in-service inspection aims at prioritising the components for inspection within the permissible risk level thereby avoiding unnecessary inspections. Various methods have been evolved for prioritisation, in which the importance measure approach has gained a wide popularity. This paper presents an importance measure that can be employed to prioritise components of any dimension, which is normally required from the point of view of carrying out a risk informed in-service inspection of nuclear power plants.
Keywords :
Probabilistic safety assessment , Risk informed in-service inspection , Importance measures , Differential importance measure
Journal title :
Reliability Engineering and System Safety
Serial Year :
2003
Journal title :
Reliability Engineering and System Safety
Record number :
1571246
Link To Document :
بازگشت