Title of article :
A geometric process repair model for a repairable cold standby system with priority in use and repair
Author/Authors :
Zhang، نويسنده , , Yuan Lin and Wang، نويسنده , , Guan Jun، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2009
Pages :
6
From page :
1782
To page :
1787
Abstract :
In this paper, a deteriorating cold standby repairable system consisting of two dissimilar components and one repairman is studied. For each component, assume that the successive working times form a decreasing geometric process while the consecutive repair times constitute an increasing geometric process, and component 1 has priority in use and repair. Under these assumptions, we consider a replacement policy N based on the number of repairs of component 1 under which the system is replaced when the number of repairs of component 1 reaches N . Our problem is to determine an optimal policy N * such that the average cost rate (i.e. the long-run average cost per unit time) of the system is minimized. The explicit equation of the average cost rate of the system is derived and the corresponding optimal replacement policy N * can be determined analytically or numerically. Finally, a numerical example with Weibull distribution is given to illustrate some theoretical results in this paper.
Keywords :
Renewal reward theorem , Priority , Replacement policy , convolution , Geometric process
Journal title :
Reliability Engineering and System Safety
Serial Year :
2009
Journal title :
Reliability Engineering and System Safety
Record number :
1572567
Link To Document :
بازگشت