Title of article :
Genetic algorithm for production lot planning of steel pipe
Author/Authors :
DAWEI، LI نويسنده , , LI، WANG نويسنده , , MENGGUANG، WANG نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 1999
Pages :
-53
From page :
54
To page :
0
Abstract :
This paper examines the fundamentals of some problems in builderʹs risk insurance for contractors when there are losses involving temporary structures in construction. Several case studies show the practical aspects of insurance claim settlement in such situations. While temporary structures used during construction are technically not covered by the builderʹs risk policy, it nevertheless behooves the contractor to be acquainted with some of the practical aspects of settling claims in case of loss. Also, such matters as loss prevention, deductibles, policy exclusions, and the principles of obtaining insurance on alteration projects are discussed. The paper is based on a speech given by the writer at the ASCE Seminar of the Metropolitan Section Construction Group on February 9, 1998.
Keywords :
Genetic algorithm , optimal cutting , production lot planning
Journal title :
PRODUCTION PLANNING & CONTROL
Serial Year :
1999
Journal title :
PRODUCTION PLANNING & CONTROL
Record number :
15728
Link To Document :
بازگشت