Title of article :
A dynamic lot-sizing model with quantity discount
Author/Authors :
GHYR، FUCHIAO نويسنده , , HUANG، SHIH-TAO نويسنده , , LAI، SHUN DE نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 1999
Pages :
-66
From page :
67
To page :
0
Abstract :
This paper examines the fundamentals of some problems in builderʹs risk insurance for contractors when there are losses involving temporary structures in construction. Several case studies show the practical aspects of insurance claim settlement in such situations. While temporary structures used during construction are technically not covered by the builderʹs risk policy, it nevertheless behooves the contractor to be acquainted with some of the practical aspects of settling claims in case of loss. Also, such matters as loss prevention, deductibles, policy exclusions, and the principles of obtaining insurance on alteration projects are discussed. The paper is based on a speech given by the writer at the ASCE Seminar of the Metropolitan Section Construction Group on February 9, 1998.
Keywords :
preceding policy , quantity discount , dynamic lot-sizing , recursive relationship
Journal title :
PRODUCTION PLANNING & CONTROL
Serial Year :
1999
Journal title :
PRODUCTION PLANNING & CONTROL
Record number :
15732
Link To Document :
بازگشت