Title of article
Assessing maintenance contracts when preventive maintenance is outsourced
Author/Authors
Wu، نويسنده , , Shaomin، نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 2012
Pages
7
From page
66
To page
72
Abstract
In some companies, corrective maintenance is conducted in-house but preventive maintenance might be outsourced. This raises a need to optimise some parameters such as the number of contracts from a perspective of the equipment owner. This paper considers a maintenance policy for such a situation, analyses the roles of the parameters in a PM model, proposes approaches to defining bonus functions, and finally discusses special cases of both the PM policy and the bonus function. Numerical examples are also given to explore the impact of parameters on the expected lifecycle cost rate.
Keywords
Maintenance outsourcing , Corrective maintenance (CM) , Preventive maintenance (PM) , Minimal repair , Bonus function
Journal title
Reliability Engineering and System Safety
Serial Year
2012
Journal title
Reliability Engineering and System Safety
Record number
1573243
Link To Document