Title of article :
A decision-making framework to integrate maintenance contract conditions with critical spares management
Author/Authors :
Godoy، نويسنده , , David R. and Pascual، نويسنده , , Rodrigo and Knights، نويسنده , , Peter، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2014
Abstract :
Maintenance outsourcing is a strategic driver for asset intensive industries pursuing to enhance supply chain performance. Spare parts management plays a relevant role in this premise since its significant impact on equipment availability, and hence on business success. Designing critical spares policies might therefore seriously affect maintenance contracts profitability, yet service receivers and external providers traditionally attempt to benefit separately. To coordinate both chain parties, we investigated whether the spare components pool should be managed in-house or contracted out. This paper provides a decision-making framework to efficiently integrate contractual conditions with critical spares stockholding. Using an imperfect maintenance strategy over a finite horizon, the scheme maximizes chain returns whilst evaluating the impact of an additional part to stock. As result, an original joint value – preventive interval and stock level – sets the optimal agreement to profitably allocate the components pool within the service contract. Subsidization bonuses on preventive interventions and pooling costs are also estimated to induce the service provider to adjust its policy when needed. The proposed contractual conditions motivate stakeholders to continuously improve maintenance performance and supply practices, thus obtaining higher joint benefits.
Keywords :
Imperfect maintenance , Inventory pooling allocation , Maintenance outsourcing contract , Spare parts stockholding , Supply chain coordination
Journal title :
Reliability Engineering and System Safety
Journal title :
Reliability Engineering and System Safety