Title of article :
Influence of organic loading on an anaerobic sequencing biofilm batch reactor (ASBBR) as a function of cycle period and wastewater concentration
Author/Authors :
Siman، نويسنده , , Renato R and Borges، نويسنده , , Alisson C and Ratusznei، نويسنده , , Suzana M and Rodrigues، نويسنده , , José A.D and Zaiat، نويسنده , , Marcelo and Foresti، نويسنده , , Eugenio and Borzani، نويسنده , , Walter، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2004
Pages :
7
From page :
241
To page :
247
Abstract :
The effect of organic loading on the performance of a mechanically stirred anaerobic sequencing biofilm batch reactor (ASBBR) has been investigated, by varying influent concentration and cycle period. For microbial immobilization 1-cm polyurethane foam cubes were used. An agitation rate of 500 rpm and temperature of 30±2 °C were employed. Organic loading rates (OLR) of 1.5–6.0 g COD l−1 d−1 were applied to the 6.3-l reactor treating 2.0 l synthetic wastewater in 8 and 12-h batches and at concentrations of 500–2000 mg COD l−1, making it possible to analyze the effect of these two operation variables for the same organic loading range. Microbial immobilization on inert support maintained approximately 60 gTVS in the reactor. Filtered sample organic COD removal efficiencies ranged from 73 to 88% for organic loading up to 5.4 g COD l−1 d−1. For higher organic loading (influent concentration of 2000 mg COD l−1 and 8-h cycle) the system presented total volatile acids accumulation, which reduced organics removal efficiency down to 55%. In this way, ASBBR with immobilized biomass was shown to be efficient for organic removal at organic loading rates of up to 5.4 g COD l−1 d−1 and to be more stable to organic loading variations for 12-h cycles. This reactor might be an alternative to intermittent systems as it possesses greater operational flexibility. It might also be an alternative to batch systems suspended with microorganisms since it eliminates both the uncertainties regarding granulation and the time necessary for biomass sedimentation, hence reducing the total cycle period.
Keywords :
Wastewater concentration , ASBBR , organic loading , Cycle period , Immobilized biomass
Journal title :
Journal of Environmental Management
Serial Year :
2004
Journal title :
Journal of Environmental Management
Record number :
1580212
Link To Document :
بازگشت