    A semi-infinite programming model for earliness/tardiness production planning with simulated annealing

  • Author/Authors

    Li، نويسنده , , Y and Wang، نويسنده , , D، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 1997
  • Pages
    8
  • From page
    35
  • To page
    42
  • Abstract
    To describe the earliness/tardiness production planning problems in the JIT environment, a nonlinear semi-infinite programming model was proposed in [1]. Due to a nonconvex objective function and infinitely many constraints, the model is difficult to solve by traditional methods. In this paper, simulated annealing method combined with a heuristic and the steepest descent method is developed. Numerical results shows that the present approach is very efficient. In theory, the developed method is an attempt to solve a continuous domain problem by simulated annealing.
  • Keywords
    Earliness/tardiness schedule , Semi-infinite programming , heuristic , SIMULATED ANNEALING
  • Journal title
    Mathematical and Computer Modelling
  • Serial Year
    1997
  • Journal title
    Mathematical and Computer Modelling
  • Record number

    1590856