Author/Authors :
Alikulov، نويسنده , , Sh. A. and Baytelesov، نويسنده , , S.A. and Boltaboev، نويسنده , , A.F. and Kungurov، نويسنده , , F.R. and Menlove، نويسنده , , H.O. and O’Connor، نويسنده , , W. and Osmanov، نويسنده , , B.S. and Salikhbaev، نويسنده , , U.S.، نويسنده ,
Abstract :
The article reports the results of 235U burn-up measurements using 137Cs activity technique for 12 nuclear fuel assemblies of WWR-SM research reactor after 3-year cooling time. The discrepancy between the measured and the calculated burn-up values was about 3%. To increase the reliability of the data and for cross-check purposes, neutron measurement approach was also used. Average discrepancy between two methods was around 12%.