Title of article :
A multi-criteria scheduling with due-window assignment problem
Author/Authors :
Gur Mosheiov، نويسنده , , Gur and Sarig، نويسنده , , Assaf، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2008
Pages :
10
From page :
898
To page :
907
Abstract :
We study a multi-criteria scheduling and due-window assignment problem, in which the cost components are: flow-time, earliness, tardiness and due-window cost. Jobs completed within the due-window are assumed to be on time, and no earliness ∖ tardiness cost is incurred. The due-window starting time is a given parameter, whereas the due-window completion time (i.e., the window size) is determined during sales negotiations with the customer, and is therefore a decision variable. The problem is shown to be solved (finding both the schedule and the due-window size) in polynomial time.
Keywords :
Scheduling , Due-window , Flow-time , Multi-criteria , Earliness–tardiness
Journal title :
Mathematical and Computer Modelling
Serial Year :
2008
Journal title :
Mathematical and Computer Modelling
Record number :
1595732
Link To Document :
بازگشت