    Industrial test and techno-economic analysis of CO2 capture in Huaneng Beijing coal-fired power station

  • Author/Authors

    Huang، نويسنده , , Bin and Xu، نويسنده , , Shisen and Gao، نويسنده , , Shiwang and Liu، نويسنده , , Lianbo and Tao، نويسنده , , Jiye and Niu، نويسنده , , Hongwei and Cai، نويسنده , , Ming and Cheng، نويسنده , , Jian، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2010
  • Pages
    8
  • From page
    3347
  • To page
    3354
  • Abstract
    The first industrial-scale CO2 capture plant in China has been demonstrated at Huaneng Beijing power plant has shown that this technology is a good option for the capture of CO2 produced by commercial coal-fired power plants. The commissioning and industrial tests are introduced in this paper. The tests show that in the early stages of the passivation phase, the concentration variations of amine, anti-oxidant and Fe3+ are in the normal range, and the main parameters achieve the design value. The efficiency of the CO2 capture was about 80–85%, and by the end of January 2009 about 900 tons of CO2 (99.7%) have been captured. The equipment investment and consumptive costs, including steam, power, solution and others, have been analyzed. The results show: the cost of the absorber and the stripper account for about 50% of main equipment; the consumptive cost is about 25.3 US$ per metric tons of CO2, of which the steam requirement accounts for about 55%; the COE increased by 0.02 US$/kW h and the electricity purchase price increased by 29%.
  • Keywords
    Coal-fired power plant , CO2 capture , Capture cost , MEA , Avoided cost , Demonstration