• Title of article

    Stochastic short-term maintenance scheduling of GENCOs in an oligopolistic electricity market

  • Author/Authors

    Fotouhi Ghazvini، نويسنده , , Mohammad Ali and Canizes، نويسنده , , Bruno and Vale، نويسنده , , Zita and Morais، نويسنده , , Hugo، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2013
  • Pages
    11
  • From page
    667
  • To page
    677
  • Abstract
    In the proposed model, the independent system operator (ISO) provides the opportunity for maintenance outage rescheduling of generating units before each short-term (ST) time interval. Long-term (LT) scheduling for 1 or 2 years in advance is essential for the ISO and the generation companies (GENCOs) to decide their LT strategies; however, it is not possible to be exactly followed and requires slight adjustments. The Cournot-Nash equilibrium is used to characterize the decision-making procedure of an individual GENCO for ST intervals considering the effective coordination with LT plans. Random inputs, such as parameters of the demand function of loads, hourly demand during the following ST time interval and the expected generation pattern of the rivals, are included as scenarios in the stochastic mixed integer program defined to model the payoff-maximizing objective of a GENCO. Scenario reduction algorithms are used to deal with the computational burden. Two reliability test systems were chosen to illustrate the effectiveness of the proposed model for the ST decision-making process for future planned outages from the point of view of a GENCO.
  • Keywords
    Cournot model , Game theory , Maintenance scheduling , Nash equilibrium , Stochastic mixed integer programming , Oligopolistic market
  • Journal title
    Applied Energy
  • Serial Year
    2013
  • Journal title
    Applied Energy
  • Record number

    1605821