• Title of article

    The Use of Slimhole Drilling and Monobore Completions To Reduce Development Costs of the Kuparuk River Field

  • Author/Authors

    Petrash، D.K. نويسنده , , Pearson، C.M. نويسنده , , Zernell، J.T. نويسنده , , Zanghi، Michael نويسنده ,

  • Issue Information
    فصلنامه با شماره پیاپی سال 1999
  • Pages
    -18
  • From page
    19
  • To page
    0
  • Abstract
    In 1994, a low-cost development and operating plan for future wells at the Kuparuk River Field was proposed with the goal of reducing well costs 30% by the end of 1996. This paper presents this plan of a slimhole drilling and monobore completion program, a discussion of the critical issues addressed to successfully make the change, and field results from the first 16 wells drilled in 1994 and 1995. A review of historical cost information is included which covers drilling and completing wells using the conventional well designs that had become standard in the field for the previous 10 years. A variety of new slimhole well plans are presented for both production and injection wells together with a discussion of their potential application and cost savings. The paper concludes with a look at future work plans and opportunities for additional cost savings through the use of slimhole wells.
  • Keywords
    Visitor Pattern , Separation of Concerns , Recursive Programming
  • Journal title
    SPE Drilling and Completion
  • Serial Year
    1999
  • Journal title
    SPE Drilling and Completion
  • Record number

    16166