Title of article :
Behavior of curved steel trapezoidal box-girders during construction
Author/Authors :
Topkaya، نويسنده , , Cem and Williamson، نويسنده , , Eric B. and Frank، نويسنده , , Karl H.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2004
Pages :
13
From page :
721
To page :
733
Abstract :
In recent years, steel, trapezoidal box-girders for curved highway interchanges have been used extensively. For these structural systems, the majority of the steel girder cross-sectional stresses occur during the concrete pouring sequence. This paper describes a comprehensive study on the behavior of curved girders during construction. Data collected for the current research shows significant differences between the measured and predicted quantities, particularly for later pours. An overview of the steel–concrete interface behavior at early concrete ages and the development of an analytical tool to predict the response of systems with semi-cured concrete are given. Field monitoring of two bridges during construction is presented. The measured results were compared to analytical predictions obtained using software developed specifically under this research to address deficiencies with currently available analytical tools. Accounting for strength and stiffness gained throughout the construction process, the developed software is able to accurately capture girder stresses during construction.
Keywords :
Bridge , field monitoring , construction , Pour sequence , analysis
Journal title :
Engineering Structures
Serial Year :
2004
Journal title :
Engineering Structures
Record number :
1639712