• Title of article

    Lessons learned from infrastructure operation in the CUTE project

  • Author/Authors

    Stolzenburg، نويسنده , , K. and Tsatsami، نويسنده , , V. and Grubel، نويسنده , , H.، نويسنده ,

  • Issue Information
    روزنامه با شماره پیاپی سال 2009
  • Pages
    11
  • From page
    7114
  • To page
    7124
  • Abstract
    The project CUTE (Clean Urban Transport for Europe) comprised the operation of 27 fuel cell buses and their hydrogen infrastructures for two years under everyday conditions. aper focuses on the experiences with on-site hydrogen infrastructure operation in CUTE. Every site had a hydrogen refuelling station (350 bar rated pressure), and most of the facilities included a plant for generation of the fuel (steam methane reforming or water electrolysis). Qualitative and quantitative performance indicators such as system availability, root causes for downtime and hydrogen losses are discussed. Problems during the operating phase are outlined and challenges for future work are highlighted. eral, the station units and on-site electrolysers performed well. The on-site steam reformers did not. Hydrogen compressors and dispensing equipment turned out to be the most critical components of the station units.
  • Keywords
    Hydrogen in transportation , Assessment framework , Performance Indicators , On-site hydrogen generation , Technology validation , Hydrogen refuelling stations , Water electrolysis , Steam methane reforming , Hydrogen infrastructure
  • Journal title
    International Journal of Hydrogen Energy
  • Serial Year
    2009
  • Journal title
    International Journal of Hydrogen Energy
  • Record number

    1675226