Title of article :
The Development and First Results in Commissioning Systems for Preparing and Supplying Fuel and Bed Filler to a BKZ 420-140 KS Boiler
Author/Authors :
Vtyurin، Yu. N. نويسنده , , Konovalov، V. V. نويسنده , , Kurilkin، V. G. نويسنده , , Raspopov، I. V. نويسنده , , Kravtsov، Yu. G. نويسنده , , Motorin، A. V. نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 1999
Pages :
-690
From page :
691
To page :
0
Abstract :
Results are presented of the first stage of commissioning of the nonstandard equipment of the systems for preparing and supplying fuel and bed filler to the sections of a BKZ 420-140 KS boiler with a bubbling fluidized bed.
Keywords :
structure & design , maintenance & inspection , structural frameworks , Buildings
Journal title :
Thermal Engineering
Serial Year :
1999
Journal title :
Thermal Engineering
Record number :
17469
Link To Document :
بازگشت