Title of article :
Assessing the overall performance of value engineering workshops for construction projects
Author/Authors :
Chen، نويسنده , , Wei Tong and Chang، نويسنده , , Po-Yi and Huang، نويسنده , , Ying-Hua، نويسنده ,
Issue Information :
ماهنامه با شماره پیاپی سال 2010
Abstract :
Success of a value engineering workshop (VEW) depends on numerous interrelated factors. Unfortunately, some of these factors are overlooked by VEW teams. This study applied factor analysis and the Analytic Hierarchy Process (AHP) to analyze a questionnaire survey distributed to experienced VE practitioners. A VEW performance assessment model was designed based on the data collected. The proposed model was used to assess two VEWs of a construction project to demonstrate its usefulness in performance assessment. Assessment results were analyzed, and suggestions were provided to improve VEW performance. Performance can be enhanced by using the proposed model for self-diagnosis, process improvement, and team motivation.
Keywords :
Value engineering workshop , Performance Assessment , Construction projects
Journal title :
International Journal of Project Management
Journal title :
International Journal of Project Management