• Title of article

    Assessing the overall performance of value engineering workshops for construction projects

  • Author/Authors

    Chen، نويسنده , , Wei Tong and Chang، نويسنده , , Po-Yi and Huang، نويسنده , , Ying-Hua، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2010
  • Pages
    14
  • From page
    514
  • To page
    527
  • Abstract
    Success of a value engineering workshop (VEW) depends on numerous interrelated factors. Unfortunately, some of these factors are overlooked by VEW teams. This study applied factor analysis and the Analytic Hierarchy Process (AHP) to analyze a questionnaire survey distributed to experienced VE practitioners. A VEW performance assessment model was designed based on the data collected. The proposed model was used to assess two VEWs of a construction project to demonstrate its usefulness in performance assessment. Assessment results were analyzed, and suggestions were provided to improve VEW performance. Performance can be enhanced by using the proposed model for self-diagnosis, process improvement, and team motivation.
  • Keywords
    Value engineering workshop , Performance Assessment , Construction projects
  • Journal title
    International Journal of Project Management
  • Serial Year
    2010
  • Journal title
    International Journal of Project Management
  • Record number

    1840249