Title of article
An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index
Author/Authors
Pajares، نويسنده , , Javier and Lَpez-Paredes، نويسنده , , Adolfo، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2011
Pages
7
From page
615
To page
621
Abstract
In this paper we propose two new metrics that combine Earned Value Management (EVM) and Project Risk Management for project controlling and monitoring. We compare EVM cost and schedule variances with the deviation the project should have under the risk analysis expected conditions.
two indexes allow project managers to analyse whether the project over-runs are within expected variability or there are structural and systemic changes over the project life cycle. The new monitoring indexes we present are the Cost Control Index and the Schedule Control Index.
Keywords
Project Management , Risk management , Earned value management
Journal title
International Journal of Project Management
Serial Year
2011
Journal title
International Journal of Project Management
Record number
1840378
Link To Document