• Title of article

    Assessing risk management capability of contractors in subway projects in mainland China

  • Author/Authors

    Mu، نويسنده , , Shiyu and Cheng، نويسنده , , Hu and Chohr، نويسنده , , Mohamed and Peng، نويسنده , , Wei، نويسنده ,

  • Issue Information
    ماهنامه با شماره پیاپی سال 2014
  • Pages
    9
  • From page
    452
  • To page
    460
  • Abstract
    Contractorʹs risk management capability (RMC) reflects the sophistication of contractorʹs understanding of risk portfolio and how to manage those risks. This paper aims to develop a RMC assessment model for subway project contractors and to assess the current overall RMC of subway project contractors in mainland China. To achieve the objectives, a questionnaire survey was conducted and data were collected from 58 respondents. The empirical research findings showed that the overall RMC of subway project contractors can be regarded as between “low” and “medium”. In addition, currently in subway projectsʹ area, contactorʹs risk analysis capability is relatively more mature than other capabilities. However, contractorsʹ risk management attitude is relatively less mature than other capabilities. Assessing the current RMC of subway project contractors can be used to identify the priority or weakest areas needed for improvement.
  • Keywords
    Fuzzy synthetic evaluation , Contractor , Mainland China , Risk management capability , Subway project
  • Journal title
    International Journal of Project Management
  • Serial Year
    2014
  • Journal title
    International Journal of Project Management
  • Record number

    1840835