An exploration into cost-influencing factors on construction projects
Author/Authors
Cheng، نويسنده , , Ying-Mei، نويسنده ,
Issue Information
ماهنامه با شماره پیاپی سال 2014
Pages
11
From page
850
To page
860
Abstract
Construction cost overrun is a common problem in construction industries. The objective of this research is to extract the key cost-influencing factors with new concept and methods to help control the expenditure. Hence, this research adopts the Modified Delphi Method (MDM) with 2 groups and 2 rounds and Kawakita Jiro method (KJ) to consolidate the expertsʹ opinions and identify and rank the key factors that affect project costs. Ninety cost-influencing factors are collected from literary review and interviews with experts with practical cost control experiences in the construction companies (Group 1). The KJ method is used to consolidate these factors into 4 categories and down to a total of 42 factors. 2 rounds of questionnaires are then conducted to filter the key factors. In order to verify views of those in the first group, Group 2 consists of experienced experts from the public sectors, consulting firms and construction companies as a comparison. Results of the analysis indicate that there are 16 key cost-influencing factors. Severity Index computation was then adopted to rank these key cost-influencing factors. The study renders that clearly defined scope of project in the contract and cost control are the major determinants for cost overrun.
Keywords
Cost-influencing factors , Modified Delphi Method , KJ method , Cost control
Journal title
International Journal of Project Management
Serial Year
2014
Journal title
International Journal of Project Management
Record number
1840872
Link To Document