Title of article :
Economic analysis of biomass power generation schemes under renewable energy initiative with Renewable Portfolio Standards (RPS) in Korea
Author/Authors :
Moon، نويسنده , , Ji-Hong and Lee، نويسنده , , Jeung-Woo and Lee، نويسنده , , Uen-Do، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2011
Pages :
8
From page :
9550
To page :
9557
Abstract :
An economic analysis of biomass power generation was conducted. Two key technologies—direct combustion with a steam turbine and gasification with a syngas engine—were mainly examined. In view of the present domestic biomass infrastructure of Korea, a small and distributed power generation system ranging from 0.5 to 5 MWe was considered. It was found that gasification with a syngas engine becomes more economically feasible as the plant size decreases. Changes in the economic feasibilities with and without RPS or heat sales were also investigated. A sensitivity analysis of each system was conducted for representative parameters. Regarding the cost of electricity generation, electrical efficiency and fuel cost significantly affect both direct combustion and gasification systems. Regarding the internal rate of return (IRR), the heat sales price becomes important for obtaining a higher IRR, followed by power generation capacity and electrical efficiency.
Keywords :
Biomass combustion , Renewable Portfolio Standards (RPS) , Economic Feasibility , Biomass gasification
Journal title :
Bioresource Technology
Serial Year :
2011
Journal title :
Bioresource Technology
Record number :
1925420
Link To Document :
بازگشت