Title of article :
Pilot scale experiment with MBR operated in intermittent aeration condition: Analysis of biological performance
Author/Authors :
Marco Capodici، نويسنده , , M. and Di Bella، نويسنده , , G. and Di Trapani، نويسنده , , D. and Torregrossa، نويسنده , , M.، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2015
Pages :
8
From page :
398
To page :
405
Abstract :
The effect of intermittent aeration (IA) on a MBR system was investigated. The study was aimed at analyzing different working conditions and the influence of different IA cycles on the biological performance of the MBR pilot plant, in terms of organic carbon and ammonium removal as well as extracellular polymeric substances (EPSs) production. The membrane modules were placed in a separate compartment, continuously aerated. This configuration allowed to disconnect from the filtration stage the biological phenomena occurring into the IA bioreactor. The observed results highlighted good efficiencies, in terms of organic carbon and ammonium removal. It was noticed a significant soluble microbial products (SMPs) release, likely related to the higher metabolic stress that anoxic conditions exerted on the biomass. However, the proposed configuration, with the membranes in a separate compartment, allowed to reduce the EPSs in the membrane tank even during the non-aerated phase, thus lowering fouling development.
Keywords :
intermittent aeration , Biological treatment , Activated sludge , MBR systems
Journal title :
Bioresource Technology
Serial Year :
2015
Journal title :
Bioresource Technology
Record number :
1938956
Link To Document :
بازگشت