Title of article
Bridge over the Besos river, Barcelona, Spain
Author/Authors
Dubey، .SJ نويسنده ,
Issue Information
روزنامه با شماره پیاپی سال 1999
Pages
-186
From page
187
To page
0
Abstract
The article reports on the construction of concrete chutes and baffles as a measure to control erosion of slopes of high formation on the new railway bridge across the Chambal river. The bridge is a through girder bridge 850.35 m long between Agra and Gwalior stations on the central railway line from Mumbai to New Delhi. The measures adopted for the drainage system as described in thepaper below have shown good results during the recent monsoon.
Keywords
Zinc , Electrowinning , Current efficiency
Journal title
INDIAN CONCERTE JOURNAL
Serial Year
1999
Journal title
INDIAN CONCERTE JOURNAL
Record number
19860
Link To Document