Author/Authors :
Münzer، نويسنده , , H and Rohrer، نويسنده , , L and Carli، نويسنده , , W and Hartung، نويسنده , , Schnitter، نويسنده , , H and Trinks، نويسنده , , U، نويسنده ,
Abstract :
The terminal voltage of the MP-tandem in routine operation has been raised to 15 MV. A new negative ion injector with mass resolutions up to 1:180 has been installed. Commissioning of the superconducting booster TRITRON is in progress, the beam has been injected and gone along 2.6 turns. The TRITRON and most subsystems of the tandem are now under computer control.