Title of article
The PEP-II B-factory: status and prospects
Author/Authors
Kozanecki، نويسنده , , W، نويسنده ,
Pages
6
From page
59
To page
64
Abstract
The PEP-II asymmetric electron–positron collider, which was completed in July 1998, has started delivering luminosity to the BaBar experiment at SLAC. This paper summarizes the design issues of this novel accelerator complex, the PEP-II performance as achieved during the commissioning runs, and the early running experience with BaBar.
Keywords
PEP-II , High-energy particles , BaBar experiment
Journal title
Astroparticle Physics
Record number
2012098
Link To Document