• Title of article

    The PEP-II B-factory: status and prospects

  • Author/Authors

    Kozanecki، نويسنده , , W، نويسنده ,

  • Pages
    6
  • From page
    59
  • To page
    64
  • Abstract
    The PEP-II asymmetric electron–positron collider, which was completed in July 1998, has started delivering luminosity to the BaBar experiment at SLAC. This paper summarizes the design issues of this novel accelerator complex, the PEP-II performance as achieved during the commissioning runs, and the early running experience with BaBar.
  • Keywords
    PEP-II , High-energy particles , BaBar experiment
  • Journal title
    Astroparticle Physics
  • Record number

    2012098