Title of article
Commissioning of the KEK B-factory
Author/Authors
Iijima، نويسنده , , Toru، نويسنده ,
Pages
5
From page
65
To page
69
Abstract
The commissioning of the KEK B-factory started on December 1, 1998. In this paper, results obtained by August 1999 are briefly reported. The topics include the accelerator commissioning, the energy scan and the studies of the detector background.
Keywords
CP violation , Electron–positron collider , B.factory
Journal title
Astroparticle Physics
Record number
2012099
Link To Document