Author/Authors :
Aiba، نويسنده , , Masamitsu and Yoshimoto، نويسنده , , Masahiro and Mori، نويسنده , , Yoshiharu and Machida، نويسنده , , Shinji and Yokoi، نويسنده , , Takeichiro، نويسنده ,
Abstract :
A study of the acceptance of FFAG accelerators was carried out for the FFAG-based neutrino factory. Through the study, the basic parameters of 1 GeV/c ring, which is the first ring cascaded to accelerate muon beam up to 20 GeV/c, was optimized to have the large transverse acceptance of an order of 10,000π mm mrad.