Title of article
Technical design aspects of Feasibility Study-II
Author/Authors
Zisman، نويسنده , , M.S.، نويسنده ,
Pages
6
From page
384
To page
389
Abstract
Feasibility Study-II examined a high-performance Neutrino Factory providing 1×1020 neutrinos per year aimed at a long-baseline detector. The Study was sponsored jointly by BNL and the Neutrino Factory and Muon Collider Collaboration and is based on a 1 MW proton driver operating at 24 GeV, i.e., an upgraded version of the AGS accelerator. Compared with the earlier FNAL-sponsored study (Feasibility Study-I), there is a sixfold improvement in performance. Here we describe details of the implementation of Study-II concepts and discuss their efficacy. Alternative approaches that will be pursued in follow-on R&D activities are also described briefly.
Keywords
Neutrino , Factory , Muon , storage ring
Journal title
Astroparticle Physics
Record number
2021619
Link To Document