• Title of article

    Beam commissioning for neutron and muon facility at J-PARC

  • Author/Authors

    Meigo، نويسنده , , Shin-ichiro and Ohi، نويسنده , , Motoki and Kai، نويسنده , , Tetsuya and Ono، نويسنده , , Takehiro and Ikezaki، نويسنده , , Kiyomi and Haraguchi، نويسنده , , Tetsuya and Fujimori، نويسنده , , Hiroshi and Sakamoto، نويسنده , , Shinichi، نويسنده ,

  • Pages
    3
  • From page
    41
  • To page
    43
  • Abstract
    At J-PARC, an intensive pulsed 3-GeV proton beam (1 MW and 25 Hz) extracted from a rapid cycling synchrotron (RCS) is introduced to a mercury target for a neutron source and to a carbon graphite target for a muon source. In order to obtain the beam characteristics before irradiating the targets, beam commissioning was carried out using a beam dump during the accelerator study. Along the beam line to the dump, several beam monitors were located for beam diagnostics. It was found that all the beam monitors functioned as expected.
  • Keywords
    proton beam , Beam optics , Beam commissioning , Beam emittance , Beam monitor , Rapid cycling synchrotron
  • Journal title
    Astroparticle Physics
  • Record number

    2025276