Title of article :
Project scheduling under uncertainty using fuzzy modelling and solving techniques
Author/Authors :
Masmoudi، نويسنده , , Malek and Haït، نويسنده , , Alain، نويسنده ,
Pages :
15
From page :
135
To page :
149
Abstract :
In the real world, projects are subject to numerous uncertainties at different levels of planning. Fuzzy project scheduling is one of the approaches that deal with uncertainties in project scheduling problem. In this paper, we provide a new technique that keeps uncertainty at all steps of the modelling and solving procedure by considering a fuzzy modelling of the workload inspired from the fuzzy/possibilistic approach. Based on this modelling, two project scheduling techniques, Resource Constrained Scheduling and Resource Leveling, are considered and generalized to handle fuzzy parameters. We refer to these problems as the Fuzzy Resource Constrained Project Scheduling Problem (FRCPSP) and the Fuzzy Resource Leveling Problem (FRLP). A Greedy Algorithm and a Genetic Algorithm are provided to solve FRCPSP and FRLP respectively, and are applied to civil helicopter maintenance within the framework of a French industrial project called Helimaintenance.
Keywords :
Fuzzy/possibilistic approach , Fuzzy workload , project scheduling , Parallel SGS , genetic algorithm , Helicopters maintenance
Journal title :
Astroparticle Physics
Record number :
2047544
Link To Document :
بازگشت