Title of article :
Reliability-based maintenance scheduling of powered supports in Tabas mechanized coal mine
Author/Authors :
Morshedlou، A نويسنده Department of Mining Engineering, Hamedan University of Technology, Hamedan, Iran Morshedlou, A , Dehghani، H نويسنده Division of Operation and Maintenance Engineering, Lule? University of Technology, Sweden Dehghani, H , Hoseinie، S. H نويسنده Department of Mining Engineering, Hamedan University of Technology, Hamedan Iran ,
Issue Information :
دوفصلنامه با شماره پیاپی 0 سال 2014
Pages :
8
From page :
113
To page :
120
Abstract :
در ايي هقبل ،ِ قبثليت اطوي بٌي گً ذْار ذً قذرتي ثب استفبد اس داد بّي خزاثي سهبي ثيي خزاثي بّي ثجت ضذ در طي د سبل در هعذي سغبل س گٌ طجس، ه رَد ثزرسي قزار گزفت است. داد بّ ثب استفبد اس ر شٍ بّي آهبري طي د هزحل ضبهل ثزرسي جٍ دَ ر ذًٍ جٍ دَ وّجستگي ه رَد ارسيبثي قزار گزفت ذٌ. تًبيج تحليل بّ طًبي هي د ذٌّ ك تبثع ت سَيع قبثليت اطوي بٌي گً ذْار ذً قذرتي اس تبثع گبهب تجعيت هي ك ذٌ. قبثليت اطوي بٌي گً ذْار ذً قذرتي پس اس 520 سبعت عوليبت پي سَت ث شًديكي صفز هي رسذ عولكزد آي هت قَف خ اَ ذّ ضذ پس اس طي حذ دٍ 00 سبعت، احتوبل خزاثي آي ث ثيص اس 60 درصذ هيرسذ. گً ذْار ذً قذرتي داراي 0 خزاثي در سبعت ث دَ ثب شً لٍ سزيع پس اس 20 سبعت، ث / رفتبر خزاثي ر ث ث جْ دَ زًخ خزاثي كب طّي است. زًخ خزاثي در سهبي ضز عٍ كبر ثزاثز ثب 021 0 هيرسذ. ثب ت جَ ث سيبست تعويز گً ذْاري / 0/012 هي رسذ. اس ايي سهبي ث ثعذ زًخ خزاثي ثب يك ر ذًٍ كب طّي هلاين، در سهبي 100 سبعت ث هقذار 01 حفظ پي سَتگي در سيستن ت لَيذ، ر يٍكزد تعويز گً ذْاري پيطگيزا ا تًخبه ضذ. قبثليت اطوي بٌي دستگب ثب ت جَ ث ثز بًه تعويز گً ذْاري ا تًخبه ضذ هي ت اَ ذً در يك سطح ه بٌست اس پيص تعييي ضذ حفظ ض دَ. ثب ت جَ ث وً دَار قبثليت اطوي بٌي گً ذْار ذً قذرتي ثزاي حفظ هيشاي قبثليت اطوي بٌي دستگب در 00 درصذ، فبصل سهب يً تعويز گً ذْاري پيطگيزا 15 سبعت تعييي ضذ.
Abstract :
Utilizing the gathered failure data and failure interval data from Tabas coal mine in two years, this paper discusses the reliability of powered supports. The data sets were investigated using statistical procedures and in two levels: the existence of trend and serial correlation. The results show that the powered supports follow the Gamma reliability function. The reliability of the machine decreases to almost zero after 520 operation hours and after 80 hours the probability of failure of powered supports increases to 60 percent. The failure rate of powered support shows an improving behavior and therefore a decreasing failure rate. In the beginning of the process, the failure rate is 0.021 failures per hour. This reaches the rate of 0.012 after a sudden decrease, thence forward on a gently decreasing rate and after 100 hours gets to the rate of 0.01. Regarding the maintenance policy and to protect the machine’s operation continuity, preventive maintenance strategy can be chosen. The reliability of the discussed machine can be maintained on a descent level by inspecting and controlling the parts in short term intervals. With regard to reliability plots of powered supports operation, preventive reliability-based maintenance time intervals for 80% reliability levels for powered supports is 15 hours.
Journal title :
Journal of Mining and Environment
Serial Year :
2014
Journal title :
Journal of Mining and Environment
Record number :
2050577
Link To Document :
بازگشت