Title of article :
Robust MPL scheduling considering the number of in-process jobs
Author/Authors :
Goto، نويسنده , , Hiroyuki، نويسنده ,
Issue Information :
روزنامه با شماره پیاپی سال 2009
Pages :
5
From page :
603
To page :
607
Abstract :
A robust scheduling method for max-plus linear systems is proposed. A principal concern in scheduling problems is how to accomplish robustness against external disturbances. To accomplish this, methods based on model predictive control (MPC) have been put forward to control system parameters or control inputs. In this context, we recently proposed a method for indirectly controlling the state variables by utilizing the idea of dead time. The idea imposes constraints for upper bounds of in-processing jobs between facilities, whereas several practical systems also consider the lower bounds. This paper, therefore, considers a modeling and robust scheduling method that takes into account both constraints. A numerical simulation for a transportation system is also presented in order of the methodʹs effectiveness.
Keywords :
State-space representation , Discrete-time system robustness , Max-plus-linear systems , rescheduling , Process disturbances
Journal title :
Engineering Applications of Artificial Intelligence
Serial Year :
2009
Journal title :
Engineering Applications of Artificial Intelligence
Record number :
2125121
Link To Document :
بازگشت